01
Define routine maintenance and shutdown work packages
Prepare the Jeddah manpower request from the factory’s actual maintenance plan. Identify routine scheduled work, corrective work awaiting review and work allocated to a shutdown window. List the assets and work orders included, the departments affected and the employer owner for each package. These categories need different receiving arrangements and should not be combined into one undifferentiated technical headcount.
For a shutdown, show the planned package sequence and dependencies between trades, stores, access and employer acceptance. Record the operating window and the readiness decisions needed before a team receives work. For routine coverage, identify the normal roster, reporting route and how a newly released order is assigned to the appropriate trade.
02
Allocate mechanical, electrical and instrumentation duties separately
State the equipment family, assigned tasks and essential trade evidence for each requirement line. Mechanical fitters, electricians, instrumentation technicians and utility-support workers should be matched to their own package duties. Identify which positions execute approved tasks and which employer specialists hold technical assessment or acceptance responsibility.
Describe general support separately: material movement, work-area preparation, tool delivery and document coordination can assist the package without conferring technical authority. A helper allocation should show the receiving supervisor and approved support task. Where duties change, review the task evidence and local instruction before treating the reassignment as an interchangeable worker replacement.
03
Connect team arrival with access and work-release readiness
Confirm the reporting point, induction, access arrangements and receiving supervisor for each trade team. Keep arrival, local task preparation and permission to begin the assigned package as separate statuses. Maintenance work requires site-specific planning, suitable competence and the employer’s approved controls; the workforce brief should identify the responsible owners and the information each team receives.
Record permit, isolation and work-release dependencies under the designated plant owners. A headcount confirmation cannot resolve an outstanding technical release. If a package remains unavailable, identify the current dependency and revised receiving decision so the coordinator can manage the team allocation against the actual plant condition.
04
Prepare tools, spares and stores support for each package
List the tools, specialist equipment, spare-part references and consumables needed for the released tasks. Agree who supplies them, where they are issued and who records return or replenishment. Stores-support workers need the package reference and delivery point so material handling is connected to the trade team receiving the item.
Record shortages and uncertain part references for the employer’s designated reviewer. Keep a material substitution decision with the authorised technical or stores owner. Distinguish waiting for a spare, waiting for access and waiting for an assessment when reviewing work progress; additional workers may not address a package delayed by an unresolved resource dependency.
05
Plan shutdown coverage around the package sequence
Use the employer’s work-package estimates, access windows and trade sequence to allocate shifts. Account for local instruction, movement, tool issue, scheduled breaks and handovers when reviewing the available working period. Identify which activities depend on another package’s acceptance before the next team can receive its assignment.
Name the shift coordinator and relief arrangements for the duties actually covered. A roster change should identify the receiving task and required evidence, while the package owner reviews the effect on the work sequence. Keep attendance exceptions distinct from scope changes, resource constraints and technical findings so the shutdown record explains the reason for a revised allocation.
06
Give the next shift a useful maintenance handover
For each open order, record the asset reference, assigned trade, completed work, remaining task and current plant-owner decision. Identify tools or parts held against the package and where documents are available. The next supervisor needs the current work status and receiving boundary rather than an unsupported statement that a package is nearly finished.
Keep close-out documents, technical acceptance and return-to-service decisions under the employer’s designated process. Supplied teams should report their assigned work and outstanding findings through the agreed owner. Planning guidance here supports the manpower brief; the plant’s approved procedures and authorised personnel determine the technical work and operating release.
07
Send a trade-by-trade maintenance manpower brief
Provide the Jeddah worksite, asset families, work-order scope, required trades, quantities by shift, operating window and assignment duration. Add access dependencies, essential task evidence, supervision, tools, spares and the responsibilities retained by the employer. Identify the package contacts who can clarify a changed task or receiving date.
Request AL AHAD GROUP review through the linked business enquiry and compare the response with the defined trade allocation and receiving arrangements. For individual maintenance appointments, use the corresponding recruitment page to prepare position profiles and employer assessments. For supplied teams, review the agreed coverage, relief, handover and package coordination responsibilities before confirming mobilisation.